Menu

The Walker Pritchard Partnership

logo
  • Home
  • About
    • Meet the Team
  • Divisions
  • Services
    • Cost Management
    • Principal Designer (CDM)
    • Project Management
    • Contract Admin & Employers Agent
    • Interiors Account Management
    • Other Specialist Services
  • Projects
    • Private Housing
    • Healthcare
    • Education
      • Dulverton House Sixth Form
      • Marlborough College Framework
      • Sketty Hall Refurbishment
      • TDS Lecture Theatre
      • Aberconway Lecture Theatre
      • Aberconway Seminar Facilities
      • Womaston School
      • Wingrave School
      • Athletics Pavilion Refurb
    • Retail and Leisure
    • Offices and Industrial
    • Public Services
    • WP Interiors
  • Contact

Education

Walker Pritchard have comprehensive experience within the education sector, providing Quantity Surveying Services to a full range of projects which include primary, secondary, colleges and universities.

Walker Pritchard understand the challenging environment of completing a project in and around existing education facilities and we work with architects, designers and contractors, to ensure that minimal disruption is caused to the students and staff. This can often lead to projects being undertaken during half term and summer holidays in fast-track multi-site projects, all with strict programme deadlines and budget constraints.

Below are a few examples of our projects:

Dulverton House Sixth Form

Dulverton House Sixth Form

Dulverton House Sixth Form

Dulverton House Sixth Form

One of a kind…. This truly unique project consisted of the transformation of a Grade II* listed building with Gloucester Cathedral as its back drop.

The works consisted of a number of specialist services including Archaeologists, lime conservation plaster, lead roofing and the painstaking restoration of a number of the buildings’ original stone walls, ornate timber structures and supports.

The building was then beautifully finished by a dedicated interior design team, who utilised a number of local artists to create some exclusive artwork throughout the building, together with a selection of bespoke joinery pieces.

Architect: Roberts Limbrick
Contractor: Town & City Builders
Photographs courtesy of James Fear
Marlborough College Framework

Marlborough College Framework

Marlborough College Framework

Marlborough College Framework

Walker Pritchard were appointed by the College to provide QS Services for all of their Revenue Projects, which includes;

  • Refurbishment of Existing Boarding Houses.
  • Refurbishment of Sport Facilities.
  • Re-construction of a Large Retaining Wall.
  • Extensive Structural Repairs to a Grade II Listed Building.
  • Re-roofing Projects.
Photos Courtesy of Marlborough College
Sketty Hall Refurbishment

Sketty Hall Refurbishment

Sketty Hall Refurbishment

Sketty Hall Refurbishment

Project Description

Refurbishment and conversion of Sketty Hall, a Grade II Listed former conference and wedding venue into a fully-fledged Business School.

The works compromised of a complete redecoration of the existing building internally and externally, complete Mechanical and Electrical upgrade and a strip and replacement of the entire existing roof.

The works also consisted the reconfiguration of the space to incorporate a new unisex accessible changing room and WC.

Photos courtesy of Knox and Wells

 

TDS Lecture Theatre

TDS Lecture Theatre

TDS Lecture Theatre

TDS Lecture Theatre

Project Description

The nature of the works was for the refurbishment, repair and upgrade works to the main tiered lecture theatre and 6no. seminar rooms at Ty Dewi Sant, which is located within the the Heath Park NHS complex.

The Main Tiered Lecture Theatre consisted of:

  • Versitile Seating Arrangement consisting of Fixed Seating, Turn & Learn Seating and Booth Seating for mixture of collaterative working methods.
  • Complete Mechanical Installation
  • Complete Electrical Installation
  • Acoustic Treatment to Walls and Ceilings
  • Complete Audio Visual Installation 

The Seminar Rooms consisted of:

  • Installation of a complete new Ventiliation System to each room
  • Acoustic Suspended Ceilings 
  • Installation of new LED lighting

 

The Project Team:

  • Lead Consultant: Stride Treglown
  • M&E Consultant: Houghton Greenlees & Associates
  • Cost Consultant: Walker Pritchard
  • Acoustic Consultant: Harmonia
Photos courtesy of Stride Treglown (Cardiff)
Aberconway Lecture Theatre

Aberconway Lecture Theatre

Aberconway Lecture Theatre

Aberconway Lecture Theatre

Project Description

The nature of the works was for the refurbishment, repair and upgrade works to the main tiered lecture theatre at the Aberconway site.

The Main Tiered Lecture Theatre consisted of:

  • Traditional Fixed Tier Seating
  • Complete Mechanical Installation
  • Complete Electrical Installation
  • Acoustic Treatment to Walls and Ceilings
  • Complete Audio Visual Installation 

The project also consisted of the conversion of a loose furniture seminar room into a traditional fixed seat facility. See more.... 

 

The Project Team:

  • Lead Consultant: Stride Treglown
  • M&E Consultant: Houghton Greenlees & Associates
  • Cost Consultant: Walker Pritchard
  • Acoustic Consultant: Harmonia
  • Contractor: Knox & Wells
Photos courtesy of Knox & Wells
Aberconway Seminar Facilities

Aberconway Seminar Facilities

Aberconway Seminar Facilities

Aberconway Seminar Facilities

Project Description

The nature of the works was for the refurbishment and conversion of a loose seating seminar room to a fixed seat facility at the Aberconway site.

The Main Tiered Lecture Theatre consisted of:

  • Traditional Fixed Tier Seating
  • Complete Mechanical Installation
  • Complete Electrical Installation
  • Acoustic Treatment to Walls and Ceilings
  • Complete Audio Visual Installation 

The project also consisted of the refurbishment of the main tiered lecture theatre. See more.... 

The Project Team:

  • Lead Consultant: Stride Treglown
  • M&E Consultant: Houghton Greenlees & Associates
  • Cost Consultant: Walker Pritchard
  • Acoustic Consultant: Harmonia
  • Contractor: Knox & Wells
Photos courtesy of Knox & Wells
Womaston School

Womaston School

Womaston School

Womaston School

 Project Description

The construction of a new build multi-use hall for use by a residential school.  Facilities included a gymnasium, catering, changing facilities, meeting rooms, along with a spa and plunge pool.

Wingrave School

Wingrave School

Wingrave School

Wingrave School

Project Description

This new build School was construction for a registered charitable trust specialising in care for children with special needs. The project team fully engaged with the staff and students and used workshops to allow the students to stamp a mark on their new School. Hinton Cook Architects incorperated modern methods and environmental standards with traditional construction while tailoring the requirements towards the students needs.

Photos courtesy of Hinton Cook Architects
Athletics Pavilion Refurb

Athletics Pavilion Refurb

Athletics Pavilion Refurb

Athletics Pavilion Refurb

Project Description

The work comprised of:-

  • Replacement of Timber Shingle Roof.
  • Replacement of Cladding with Weatherboarding.
  • Remodel of Existing Layout.
  • Refurbishment of Existing Metal Windows.
  • New Internal Finishes.
  • Provision of external access ramp and stairs.
  • Repairs to existing area below canopy.
  • Fitting out of new toilet facilities.
  • Fitting out of new tea point.
  • New Mechanical & Electrical Installations.

The Walker Pritchard Partnership
The Courtyard
Tewkesbury Business Park
Tewkesbury
GL20 8GD 01684 293040 info@walkerpritchard.com

Connect with us on
Visit us on Twitter Visit us on Linked In

Join our mailing list

  • Accessibility
  • Disclaimer
  • Privacy
  • Policies
Royal Institution of Chartered Surveyors link Construction Line link BMTrada Safe Contractor Approved

©2025 The Walker Pritchard Partnership. All rights reserved. Registered in England and Wales, number 03521559